Heat Pump Water Heater – Replacing 40 to 60 Gallon Natural Gas

In stock
Up to $1,350.00 each
Product ready for review
Out Of Stock

You have a saved application!

Product Requirements
 
Less than 75 Gallon
Heat pump water heater must be 3.30 UEF or higher (equipment must be AHRI rated). 
 
Heat pump water heater must replace natural gas water heater.
 
The existing tank must be a 40 to 60 gallon natural gas storage water heater Heat pump water heater must be greater than 55 gallons and less than or equal to 75 gallons.
 
The existing tank must be a 40 gallon (UEF 0.64 or less), 50 gallon (UEF 0.63 or less), or 60 gallon (UEF 0.61 or less) natural gas storage water heater
 
The existing water heater must be removed and disposed rather than refurbished and sold.
 

Customer Eligibility

Must be an SCE Customer 

Must be located on the DAC/Low-income map (California Climate Investments Priority Populations Mapping Tool 4.0) and meet legend requirements: 
  • Blue: Low-Income Community 
  • Yellow: Disadvantaged Community: CES 
  • Green: Disadvantaged Community: CES, Low-Income Community -Dwelling must be single family or multi-family with four units per foundation or less. 
Independently metered In-unit appliances (not shared) New construction is not eligible. 
 
Incentive amount cannot exceed purchase price.
 
Use an SCE HPP Participating Contractor (Trade Ally) to perform upgrades and submit rebate application(s) on the homeowner's behalf.
 
Must NOT be in any state assistance programs
 
Other Requirements

Application must be submitted with 90 days of installation date. 
 
Homes are eligible for one incentive per existing unit
 
All installed measures must follow current ETRM version guidelines in additional to SCE guidelines to qualify for rebates
 
Fuel substitution incentives require that applications must include an itemized invoice of infrastructure upgrade costs if any of the following was completed: 
  • Provide photo showing that the installed HPWH is in either "hybrid" or "heat pump mode" 
  • Site required electric infrastructure upgrade. 
  • Fuel substitution incentives require timestamped, geotagged photos of all equipment prior to installation, and post- installation. Including nameplates of existing and installed
Application must include a signed Customer Participation Agreement.
 
Application must include a paid receipt or invoice with model number, manufacturer, purchase price and purchase date.  
 
Qualifying equipment must be new and replace existing equipment in a residence that currently receives residential electric service from Southern California Edison. 
 
Application must include a paid invoice or receipt with the model number, manufacturer, purchase price and purchase date. 
 
Application must be submitted with 90 days of installation date. 
 
HPP Incentives are NOT eligible to stack with Golden State Rebates, Comfortably California Rebates, or other SCE electric utility programs. 
 
HPP incentives can be stacked with TECH/HEEHRA.
 
Incentive amount cannot exceed purchase price and cannot exceed IMC cap from the measure package (eTRM)
 
Required Documents
  • CPA – Customer Participation Agreement 
  • SPECS – Manufacture Specifications Sheet 
  • HPWH Certificate of Compliance (AHRI Certificate) 
  • Itemized Invoice - Customer signed, dated, & stamped "Paid" or stamped "Received by Customer”, including manufacturer, model #, serial, infrastructure upgrade costs, rebate, labor and material total amount listed 
  • Permit Closure - Attestation(s) stating the following information (if applicable): 
    • Base/existing storage capacity and equipment type. 
    • Method of disposal for base/existing equipment. 
    • New construction condition that applies. 
  • Attestation – *If photo(s) of existing equipment are not provided
Required Photos
  • Measure/installed equipment.
  • Measure/installed equipment nameplate.
  • Base/existing equipment.
  • Base/existing equipment nameplate (if applicable).
  • Provide photo showing that the installed HPWH is in either "hybrid" or "heat pump mode"
  • Capped gas line(s) post installation.
*ALL PHOTOS ARE REQUIRED TO BE GEO-TAGGED AND TIMESTAMPED OR:
  • Timestamp and coordinates must be on photos 
  • Screenshot of photo, with timestamp and coordinates in it